TESCO AND OBI IN LESZNO

TESCO AND OBI IN LESZNO

In 2011 Pekabex has manufactured and delivered prefabricated reinforced and post-tensioned prestressed concrete elements in range of construction of two trade objects in Leszno – Tesco of area of approx. 8,500 m2 and OBI of area of approx. 10,000 m2. For those investments we have manufactured such prefabricated elements as reinforced concrete beams, triple-layered ground beams, column footings, reinforced concrete walls, stair flights and landings, prefabricated floors (for Tesco), and garden ground beams, triple-layered ground beams, column footings, retaining wall, HC slabs, stair flights and landings, reinforced concrete beams, and entrance portal (for OBI). We have also realized installation of structure from manufactured elements.

800 600 Pekabex - budownictwo prefabrykowane
Ta strona używa plików cookies w celach statystycznych, reklamowych oraz funkcjonalnych. Więcej informacji:
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.